blob: 4a7a6cb698276bf8bad0fcdf92c5d3c733e8b775 [file] [log] [blame]
From 3fd9b7fa2acd0ff0e00d23c8ea262a194a04511b Mon Sep 17 00:00:00 2001
From: "Steven Rostedt (VMware)" <rostedt@goodmis.org>
Date: Mon, 9 Mar 2020 16:00:11 -0400
Subject: [PATCH] ktest: Add timeout for ssh sync testing
commit 4d00fc477a2ce8b6d2b09fb34ef9fe9918e7d434 upstream.
Before rebooting the box, a "ssh sync" is called to the test machine to see
if it is alive or not. But if the test machine is in a partial state, that
ssh may never actually finish, and the ktest test hangs.
Add a 10 second timeout to the sync test, which will fail after 10 seconds
and then cause the test to reboot the test machine.
Cc: stable@vger.kernel.org
Fixes: 6474ace999edd ("ktest.pl: Powercycle the box on reboot if no connection can be made")
Signed-off-by: Steven Rostedt (VMware) <rostedt@goodmis.org>
Signed-off-by: Paul Gortmaker <paul.gortmaker@windriver.com>
diff --git a/tools/testing/ktest/ktest.pl b/tools/testing/ktest/ktest.pl
index 220d04f958a6..42b6cd41d2ea 100755
--- a/tools/testing/ktest/ktest.pl
+++ b/tools/testing/ktest/ktest.pl
@@ -1383,7 +1383,7 @@ sub reboot {
} else {
# Make sure everything has been written to disk
- run_ssh("sync");
+ run_ssh("sync", 10);
if (defined($time)) {
start_monitor;
--
2.7.4